According to the norms and rules of covering the foundations, the concrete mass needs to be reinforced with reinforcement, but you can use your own hands to build the reinforcement of the striking foundation.

According to the laws, the support of materials, the concrete monolithic block of the building showroom, is maximal for the squeeze.

At the same time, the benefit when navantazhenny "on vigin" is not great.

By the way, concrete is a cryhkim material.

To give concrete the necessary elasticity, it can be replaced with metal or composite reinforcement. The process is called Armuvannya.

Reinforcing concrete is built with the same reliability and static and dynamic navantage.

The procedure for reinforcing the line foundation is repaired when the trench is tiled.

I’m not big about the type of spa, garage, kitchenette, or a small booth with a trench I’ll hand over to the vicopati.

In such a decision on the offensive of the perevagi:

  • a small amount of wiped land;
  • trench walls;
  • obsyag concrete is required optimal.

At the bottom, a ball is poured with a size of 10 cm, which is necessary for the deflection. For qih tsіlei yogo spill water. The most effective way of preservation.

The video shows how robots will be able to pick up and prepare the trench before the pile-line construction.

As the pile-line foundation is not straight, but more folding configuration, it is necessary to take the size of the previous versions before the respect.

The length of the perimeter, measured in meters, will serve as a basis for the consumption of reinforcement.

The frame with reinforcement can be folded profile. Tse to lay down from the dimensions of the foundation. In the simplest option, the frame is selected from five later versions.

This means that the total perimeter needs to be multiplied by five. In this way, the backbone of the reinforcement is designed, as it will be needed for the foundation.

zbirka frame

When purchasing fittings, you need a vrahuvati, but a bar is required for the preparation of transverse shears. The standard length of the reinforcing bar with a diameter of 12 mm is 11.7 meters.

Bagatorial practice is to show that the frame can be made out of the way and already in the finished view to stand in the trench.

It is not easy to pick up the first way, if the collection of the reinforcement kit is to be seen with your own hands without the middle in the trench. Principled differences between different steps are not.

It is important that all the actions were displayed correctly, according to the standard alarm standards. The specific vibir is scared away from real minds.

The monolithic pile-line foundation is also rendered up to its own quality.

Tse means, that the art of presenting on the same day is the same.

Such a meaningful world is guilty of securing the reinforcement cage. The armature design needs to be taken and fixed in the selected camp with such a rank, so that the rigidity of the ball is the same for whatever reason.

The win is to become kuti. Here you will see the day of the late and transverse dilenok. Їх it is necessary to do it correctly, in the view of the technology.

Preparation of transverse elements

The frame, the designation for the armoring of the pile-line foundation, makes a shape.

In order to trim the necessary repairs, you can choose short pieces of fittings, as well as special workpieces of a round or rectangular shape.

Zruchnіshe pratsyuvati with upright clamps, as it is necessary to be able to get it out of the way. The general stage and all operations are required to be correct.

When the reinforcement cage is formed, the most frequent is the vicorist reinforcement with a diameter of 12 and 8 mm. Bend the cross clamps from a thin dart.

The accuracy of the operation is required for the right. So called the clamps are guilty of mothers of the same size.

In front of the front slid to break the size of the reinforcing bar. The height and width of the virob are determined incrementally to the size of the transverse overriding of the line foundation.

If the depth of the warehouse trench is 1 m, and the width is 0.5 m, then the size of the clamp is 0.7 and 0.3 as appropriate.

The proportions are close to the standards, which are specified in the rules of business.

Vigotoviti clamps can be done with your own hands. Here you can speed up with a verstat to bend the armature or make it simpler to attach from handheld materials.

It is even more important to correctly set up the attachment and delivery of the operations.

preparation of fittings

With a stepping crochet, it is necessary to prepare the reinforcement, from which the skeleton will be taken. The rod of the armature is to blame for the mother as well as for the dinner, as well as for the dinner of one side of the booth.

In practice, this kind of education is developed even more rarely. At the same time, if the rod of the armature comes out, it is simply formed to the necessary size.

If the armature was found short, then it is necessary to grow. Struggling through the simple ringing of two or more vidrizkiv. It is required for a special knitting dart.

It is important to remember that the overlap of the bars is to blame for not less than one meter. Armuvati foundation bazhano tsіlimi dropping a dart.

Zbirka frame pid foundation

Zruchnіshe zіbrati the frame on the maidan by the trench from the trench to the pile-line foundation. The first step is to open the clamps of the bridle of the trench on the side of one meter one from the other.

Step crochet - stretch out a full length of reinforcement in the middle of the clamp and attachment to the skin point. Then, in the same way, stretch the offensive three times.

All the stinks ring with clamps knitted with a dart. The joints of the reinforcement should be laid on top of the trimmed structure and fastened to the clamps in the same way.

For the completion of the operation, you can say that the frame is on one side of the foundation ready.

With the standard form of the pile-line foundation, such constructions can be made of chotiri. Two on both sides and two along the width.

Let's step on the way to select the design to go down on our place in the trench. Here, it is necessary to scrape together and to make it right.

Fight in the same way from the knitting dart. To improve the construction of the last cut, keep behind the help of the cut, bend the fittings.

Monolithic striking foundation of vimag of advanced mobility in the cube support points. Fitting of reinforcement can be seen from the list of all types of tools.

Tse can be a special tweezers or a hook, which you can use with your own hands.

installation of the frame

In addition, as the frame of the descents into the trench, it is necessary to correctly zorієntuvati. This is a general operation, as a result of the need for delivery as a whole.

The monolithic pile-line foundation is not in truth its significance, as there will not be a viconious forgiveness for its serpent of vimoga.

The first thing is that the reinforcement rods did not protrude from the concrete base. The video shows the correct positioning of the reinforcement cage in the trench.

Practice shows that, with an individual living environment, the rules are not expected to be met. Nichogo good from tsiy not trail.

Break the reinforcement to the ground

It is well-known to the buzzword of the building that it is between the reinforcing skeleton and the soil, which is guilty of being in the fringes of ten centimeters.

In order to secure the gap, special support should be used. In practice, it is most common to stagnate the ends of a metal coil.

horizontal plan

The reinforcing monolithic foundation will serve as a hopeful and hopeful way, as all of them have been shown with high precision during their oblastuvanny.

The upper area of ​​the frame must be placed strictly horizontally. If the top ball drops to the concrete, it will have the same thickness on all surfaces.

vertical organization

The frame must be secured in the trench in such a rank, so that the reinforcement does not stick through the walls of the formwork.

If it’s not broken, then when the concrete is poured, the whole structure can turn the form and destroy into one side.

Bichnі rozpіrki easily stand up with your own hands. For cich purposes, it is possible to build up reinforcing bars.

pouring the foundation

Correctly vikonany robots from the armoring of the striking foundation will allow the desired result. We will serve you forever and ever.

To navigate the significant changes of callous minds, such as the change of the ground waters or the persistence of the runt, not to crumble onto the jagged foundation of the honey flow.

At the same hour, the final part of the work is carried out with an even more importantly neat way to clean up the stitching foundation as a whole. Pouring the concrete is not folding, but the operation is less flexible.

The video shows how you can see it.

A lot of forgetfuls, like making a house with your own hands, vvazhayut for a beautifully vikonuvati pouring a stitching foundation independently. In such a solution, there is a rational grain.

Filling is carried out in stages. In this context, it is important to ensure that the position of the reinforcement can be maintained and that it cannot be skewed or deformed.

Upon completion of the pouring, the line foundation is guilty of gathering the strength with a stretch of three-chotiroh pressures.