In this hour, you can get a garage with a metal profile with your own hands and you can allow a lot of car enthusiasts. If there is a car, food, where to put the car. Trivial crossing under the open sky can greatly speed up the term of service. Take a look at the food, as it is known as a gadget, for the functioning of the garage. For the quiet, who has a lot of earth, a trifle for the hour and a great blessing, do something with your own hands, it’s obvious when you’re awake.

The garage can be built from old materials, it can be woody, tseglyanim, zalizobetonnym or metalivim. On the current day, the future of the garage with the metal profile will be expanded. The price can be explained by the strict terms of the construction, the hand-crafted metal material, the possibility of picking and re-folding, the advanced construction and the altogether inexpensive price of the metal profile and other parts. It’s not enough to have a quick fix for building a garage with your own hands, you can replace a ready-made option at http://www.penal.su/.

A garage of this type does not fit into folding sporuds, but all the same, it’s worth it. Do not miss anything, you need to go ahead and put a plan for the future.

Garage armchair building. Robimo detailed description of all constructions and applied dimensions. The standard is used for the size of 5x3 m and with a height of at least 2 m. Zvvychay shy odnoschiliy or dvoschiliy.

The gates can be used for ornі, section, pіdyomno-pivotnі abo roletnі. This is the belonging of independent living: you can adapt everything for your consumption and overhaul. On the schematic, a frame for a garage with a profile pipe is shown.

Materials and tools

You can have a ready-made chair, you can put a lecture change of materials, as well as develop a lot of materials. You should know:

  1. Square professional pipes with a size of 100x100 mm. Vikoristovuyutsya for the construction of non-functional constructions, їkh perevaga - visoka stikіst to zginannya. Storyuyuchi, vikoristovuyut P-sub-profile or profilny pipes.
  2. Square tubing 50x50 mm
  3. Sheet metal profile. Їm sheathed the frame from the profile pipes. When a metal profile is pitted, it is necessary to fasten the profile of the professional sheet, as it will overlap, and this means that before 150-200 mm in width on the skin arch in the fallowness from the surface of the surface.
  4. Mineral wool, as well as accessories for mounting.
  5. Steam insulators.
  6. Geotextile in the trench for cleaning the hydro-insulating concrete.
  7. Ruberoid on concrete, pid profile.
  8. The mount for the installation of profiled pipes (also the design is open, without the pick-up), will be required for the attachment of parts of the frame, bolts with nuts and coils for metal.
  9. Samorizi with gumovyhlnennyam is required for the installation of cladding on the wall.
  10. For pouring the foundation and screed with crushed stone, cement and sand. Do not forget about water.
  11. For the stem of the frame, the foundation needs plywood, wood planks, OSB boards, or be-like shields and support.
  12. Steel rods and knitting drills.
  13. Dowels.

Knowing what materials are needed, we have a list of tools needed for robots:

  • kapron motuzka abo cable and picks for the development of the territory;
  • a pair of spade shovels for the upper ball to the ground under the foundation;
  • electric concrete mixer, speed up і lay down the pouring of the foundation і pіdlogs;
  • hammer and flowers for formwork foundations from plywood, etc .;
  • grinder for the production of professional pipes and metal profiles;
  • knives for metal;
  • rіven zvychainy abo laser;
  • drill with a set drilled;
  • grabbed;
  • screwdriver;
  • tape measure і marker.

Mayuchi all the time, you can go to the preparation before the week.

Building a garage with a metal profile with your own hands

At the core of being awake is the foundation. In front of the dilyanka, in any case, it is necessary to clean up and clean up, create a trench for making a monolithic line foundation. The height of the trench walls is enriched by the peculiarities of the soil and the level of groundwater.

The walls are wicked up to 90 °, and the bottom is tamped down, covered with geotextiles and a pillow is being made up.

Before pouring, shrink the formwork (frame for the foundation). Put the shields in the socket up to the walls of the trenches;

Step croc - armouvane і filling. For many steel rods, use a dart to knit them, set them on the floor so that they come from the structure to the formwork and the upper point of the foundation of the boule 50 mm each, and fill it with concrete. Concrete is crooked with water and in the first few days it is poured with water.

Є 2 ways of assembling the design: modular and assembling on the machine. Call the other vikorists, if there are no other names. When the garage is opened with profiled pipes and the first croc in the erected frame, there will be installation of the lower tie from the horizontal profiled pipes.

Pipes of the required size should be laid on a concrete base and scraped one by one from the metal. Between the profile and the concrete, lay the progumovanovanie or the ruberoid and then the profile to fasten behind the additional cuts and dowels to the foundation.

If you want to install the vertical stays, mount the upper harness on them. Dal ustanovlyuyuyut ribs of rigidity, spreading vertically and horizontally strictly behind the chairs.

On the offensive stage, the metal profile is mounted. Yakshcho vibrated two-chili dakh, which means that they should try to beat one size and put on them crocodile wager tricot form. Kilkіno crokvyanі bet dahu guilty of coming up vertical stikkas.

Frame with profiled pipes and chastkovo zibranii, overlaid with sheathing of the profiled sheet. For dahu vikoristovuyu special profiled sheeting, it is possible to sew it with a special metal profile. If you vibrate on the rosette gate, then you can sew a professional sheet.

All the sticks to the corrugated board are sealed, and for the filling of the hydro-insulating powers, the walls and the dah are covered with a steam-insulating seal. At all stages, it is not forgotten to create an air bubble.

At the final stage of the loan, the insulation of the metal frame is sewn up from the middle of the wall and the stele is sewn with decorative materials. Yak insulated with mineral wool (polyplast and sklovata can be used), yak are sold in rolls, as well as slabs.

Heaters insert with frame strips. Namagayte vikoristovuvati warming up the tovschini, scho і stіyki, todі wіn bude lagati level.

Pislya stowage sewn up everything with clapboard, high-quality plasterboard, plastic panels or other types of cold-blooming materials. On pidlozi, call everything to end with a concrete screed, or you can lay the tiles or wood planks, in the zaghalny, where the soul is zaazha. On the whole garage of a vlasny vyrobnitstva with a profiled pipe and to get involved is prompted.