Metal formwork is a set of shields with fastening elements. Vona is designated for the establishment of wake-up operations, for the de-vikoristovoy of work of wake-up calls. Naybilsh is popular in monolithic life. Vickor formwork for pouring thin concrete when prepared palms, foundations, walls, perekrittiv. The middle design is fitted with reinforcement bars. The concrete is harder, the formwork is known to be transferred to the maidan attack.

View of metal formwork



In the midst of the magnificent development of metal structures of the largest widening, two types of formwork were built: steel and aluminum. The skin of them in its own way is valued by awakeners. Aluminum formwork for the suttuvi perevagi - the workers of the small vases at the її installation do not require special equipment for installation. Light, good shields can be taken, rozibrati, change one person.

Aluminum is not susceptible to corrosion, therefore, the shields of the metal formwork are not ready for use and can be rearranged on the budmaidanchik for a while. The main thing to pass the steel formwork is the accuracy of the geometrical profile and the high level of rigidity. The staff of the whole steel shields on the sticks with the maximum thickness lie one to one. Deformations, dents, new gaps occur. As a result, there are ideally equal areas of walls.

The formwork panels from the steel of the building are more efficient, less aluminum. In any case, it is possible to fill in the walls of the city, not to touch the zupinki on the concrete. When thin walls are erected, fill the aluminum formwork with balls with technological interruptions. At a height of 3 m, the deformation of the steel shield is allowed not more than 1 mm. The steel profile is marked with a hard aluminum, so it can be easily folded and assembled with a set.

Overhaul of metal formwork:

  • Visoka mіtsnіst;
  • Reduced functionality;
  • Trivial period of exploitation;
  • There is a great number of technological revolutions;
  • Good repairability.

Installation of metal formwork

Installation of the construction will work with the decalcities of the mounting frame. Central and internal cuts, hinges, rolling ties, walkways, walkways. Steel elements are equipped with two types of fasteners. They are preceded by a transom and a universal wedge lock.

It’s simple, but the smut is overwhelming. For the folding of the formwork with the universal wedge lock, only a hammer is required. Tsim z'єdnannyam shields to fatigue with themselves, vistavlyatsya demand kut, metal formwork is added to dodatkovy beams.

Virіvnyuchiy crossbar is a tool with a great number of functions: add-ons, displaying indirect catch, collecting shields from victories. Bagatorazovy installation and dismantling do not touch the formwork and do not cause deformations in days of the day.

Would you like a yak?

Our company realizes both new metal formwork, so it is implanted in the ideal mill. Formwork rent for any term will be promoted. The enterprise is certified in international systems of quality, є certification. Additional constructors' instructions for the deputy director to break apart the metal formwork models for individual shapes.

The availability of a powerful virobiztva and a built-in vehicle fleet for the delivery of products to Budmaidans allows you to reduce the price of metal formwork lower than that of competitors.