There are more people to change over, so there is an autonomous way of living in an apartment and a house in an economical way, without centralization. Steam scorched with my own hands - one of the folding buildings, altogether healthy, as well as the mother of the elementary robots with the power tool. Also, prior to installation, it is necessary to carry out the construction and purchase of the necessary warehouses.

Nutrition

The deyakis stray and vvazayut, but the name of such a system is right for good - watery scorched, and the prefix "steam" was lost in the past hours, if scorched, the industrial boiler was scorched, as vigotov feared great people. As a matter of fact, and for the current year, boilers, which will not allow the scorched supplication of an additional conversion of the line into two aggregate stations. The strengths of this solution are:

  • subordinate heat transfer by means of convection, as well as infrared heating;
  • minimum waste for a heat exchanger when transferring energy from a dzherel;
  • temporality;
  • vіdsutnya nebezpeka frost-freezing systems in cold weather;
  • the possibility of stagnation be-like time of fate;
  • trivial term of service without malice.

Deyakі nadolіki:

  • albeit viscous temperature of pipes and radiators;
  • Seryoznі patches for an hour I cut through;
  • deyakі folding before the hour of installation;
  • temporal strength to corrosion.

The essence of the function of that high KKD field is that the steam passing along the main line condenses and precipitates, with a great amount of heat energy being seen. With the same vitrats of fire, such a system will be more effective for going for a length of water.

Zvychay for securing the safety of koristuvachіv, in the modern boilers there are dіyut pevnі obmezhennya. For example, the maximum temperature, until the steam is heated, becomes 130º C, and the point where the grip is reached is 6 atmospheres.

View systems

Effortless types of systems are connected to single-circuit and double-circuit. At the first option, all the urgency of the boiler is to grow up for the nose, which brother will have a lot in the increased temperature in the middle. The other option is a supplementary heat exchanger, in which the heating of the flowing water is carried out, which allows the vicoristovuvati for the daily needs. With the implementation of another variant of varto memory, it is important to know that the additional communalities are brought in at the boiler room and they are turned back at the house of worship.

For the way of circulation, as well as in the form of water systems, the following are available:

  • Natural circulation or close. At the end of the condensation, the water under the injected gravitation by the natural strum without a pump turns to the boiler, again, it turns into steam and turns into steam.
  • Primusov circulation abo rozіmknenі. In most cases, the water does not go back to the heaters. Some of them go up to a special reservoir, which behind the pump will be supplied for a temporary transfer to the gas-pumping mill.

Behind the vise, all the middle see:

  1. Atmospheric. The stench is a significant grip of the hammer developing atmosphere, which from the accident can be the cause of serious injuries. In addition, in such a system, vipromynuvac grows up to high temperatures, and drank, then, burnt and see an unacceptable smell.
  2. Vacuum For the implementation of this option, the entire highway can be hermetically sealed. A vacuum is created behind the aid of a special pump in the middle. As a result, the transfer of water to the gas-pumping mill for the lower temperatures, so I move the baking.

For the method of routing pipes you see:

  • One-pipe. The pair will collapse without interruption in one pipe. On the first half of the road, they gave their energy to the radio operators, step by step transferring to the native camp. At the same time, the temperature of the vipromynuvac, as it is closer to the boiler, will be in the middle of the circuit. Many people have a great diameter trumpet, but there was no transition.

  • Double pipes Steam is supplied through one pipe, and condensate is turned along the other. With a lot of reach, all adjustments, practically do not consume the temperature. Such a variant will be relevant for the great buddies, for those who are on the surface. As far as the primacy is small, it is not sensible, the aim is to make the home party to the project.

The vacuum system is used at the test stage. At the time of registration, there will be a need for a longer availability of electrical energy, because The vacuum pump functions practically without interruption.

Boiler vibration

In order to properly prepare the opaluval attachment, beforehand it is necessary to fix the area, as it progresses. Schob tse zrobiti, you need to calculate the area of ​​the skin around the room, multiplying the width by a half. For all the results and it is necessary to reduce, the final figure and will be necessary values. It is important to remember, which is true for the height of the stele up to 3 m, if it’s more, then it’s necessary to increase the amount of pressure.

  • For the back area up to 200-300 m 2, pump the productivity of 25-30 kW.
  • For 400-600 m 2 - 35-60 kW;
  • 600‒1200 m 2 - 60‒100 kW.

The next step will be vibir paliva. Steam boilers can be easily operated from the following dzherel:

  • Ridki. It can be used, for example, a diesel engine, or a diesel engine is available. In case of such a variant, it will be necessary to distribute the aggregate in the surrounding area. This will help you to uncover the inhalation of high-flown vipariv and negative negative influences on your health.
  • Hard - firewood, wood, peat and everything that can burn with the vision of a great amount of heat.
  • Gas-like. Name the chain of natural gas particles.
  • Electric.

For some kind of solid-burning solutions, it is much cheaper to manage, ale varto vrahovuvati is not deprived of vitrati for a fire, even if it will be stained for a fire. In total, there can be more than a few years, at which it is necessary to constantly replenish the firebox, to adjust the temperature at the proper level.

Deyaki virobniki feast on vidy vidi palyva. For example, smell the stink of a firebox for a hard firing that will make TEN appear. At the same time, the efficiency does not decrease, rather the economy goes on vitrates, and therefore, on payment.

Vibir pipes

If you choose, we will fall asleep according to the planned budget. It can be said unambiguously - for systems of this type, it is not easy to use polypropylene pipes. Explain the process of non-stability up to high temperature conditions. Vibrate will be required from the next options:

  • Steel pipes. For їх installation is known to be a sounding device. The stench of stiyki is up to the high values ​​of the grip of that temperature. On the positive side, the price and the breadth are available. Incomplete - temporal strength to corrosion.

  • Galvanized pipes. Include all steel workers, plus there are few compensations for corrosion damage. The members of the community are interested in helping the business people, so they don't need robots.

  • Мідні. Є Ideal option. And there is a stench in the road for the art, besides, for the installation, special tools are needed for soldering this material.

When installing pipes, they can be captured at the wall or for a log. But at the same time, it is important to vrahovuvati, so that the awakening material will be stable before the thermal injections.

Dodatkov_ universities

The size of the boiler and the pipes for the main line will require some connection elements, which cannot be done without:

  • Radioators. Tse can be chavunny batteries, steel virobi or pipes with ribs. Vstanovlyuvati їkh more beautifully from the windows. Such a rank, pretends to be a heat plug, as it seems colder than it gets. Tse pereshkojatime and set the condensate on the slope.
  • fіtings. Additional items: muffs, coils, leads, crossovers, which are required for the installation of the pipeline.
  • Reduction-cooling unit. Zdіysnyu bet transferred to the native camp.
  • Reducer. Values ​​for regulating the grip of the system.
  • Expansion tank. Naykrashche zastosovuvati element of the type. If you need to put a sealed tank, you need to have a pressure gauge and a flap valve. As long as you can't kill, you can bring happiness to your exit.
  • Condensate collection point.
  • Circulating pump. For systems from the beginning we will use the changes of origin.
  • Hydraulic shutter. It is necessary if you need to drain the system for repair or replace any warehouse.
  • Filter. It is necessary to see solid inclusions before drinking the water into the boiler. The price is necessary, but the productivity did not change.
  • Krani Mayvsky.

The steam firing system can be fitted with an indirect heating boiler. At the same time, there is a valve for three entrances. It is connected to the thermostat and redirecting the heat transfer.

Preparatory robots

You will need to fold the chair beforehand. On the arch of the paper, a plan is applied, in which case there is an installation. The process of finding the cauldron begins. Bazhano you vidіliti okreme primіshennya. To work hard in order to secure the maximum security. As soon as the system is closed with natural circulation, the fault is guilty of perebuvati in the lower point. The price is necessary, the water could be tricky without a change.

Apply the spreading of all the systems, and introduce the spreading of all the elements, which were overhauled at the front of the child. If the croc is victorious, it is more beautiful to transfer to a specific location, so that it will be possible to skim everything more beautifully, it is necessary to bribe the pipeline near the transition or start. On the diagram, it is necessary to indicate all the cuts and transitions. In addition, as the armchair of the Viconano, it is possible to provide the most accurate material that would be necessary for the successful completion of the entire project.

Deyakі clever vigotovlyayut steam cauldron independently. It is necessary to cook from sheet material, or to prepare a special circuit from the pipes, which is laid in the oven. The other person needs to follow the camp of the heat exchanger, as the best way to get it from stainless steel, to continue the term of his service. It is also even more important to clean up the two doors with greater periodicity.

Last day

Approximately up to the viconano's layout on the diagrams:

  • The boiler is mounted. At prim_shennі, de vin perebuvatime, obov'yazkovo maє buti concrete base. There is a small foundation for consuming.
  • It is carried out with the help of the system of vivdennya vіdpratsovanih gasіv.
  • To go to the prominence. For the rest of us to get stuck on hooks, like rozrahovani on those who show off the hook. About those who are guilty of roztashovuvatisya, yshlosya vishche.
  • Kozhen radiator is able to own a Maevskiy crane for getting rid of twisted traffic jams.
  • On the small side of the boiler, at the most important points, there is an expansion tank.
  • A pressure gauge is installed at the boiler outlet, and a flip valve is used, if the grip is changed to the permissible lines.
  • The efforts of the warehouses are ringing between themselves behind the aid of pipes and vibrating material.
  • As well as the system is open, only a special reservoir and a pump are mounted on the mains.
  • From the pump to the boiler, there is a branch pipe, which is supplied with a small diameter, below everything is scorched.
  • Before the entrance to the cauldron, there is a filter, which will cover the great particles.
  • As soon as gas is used, it’s possible to get a good supply without nasty hoses.
  • Filling the line into the circuit.
  • A test launch of the system is underway and we will adjust the temperature to improve the consistency.

They looked in detail at the statistics, as if scorching a private booth. We still wanted to know about the ready and functional projects. Share your advices and cautions in the comments.

When installing burning in a wooden booth, it is necessary to determine the specifics of such awakening.

Video

Take a look at the video about those, how to correct the blight.